Company News

Baker Hughes in a massive five Offshore Pipelines Contracts with Petrobras


Published: Friday July 2, 2021
By: Oilfield Africa Review

Baker Hughes has announced that it has been awarded two flexible pipe  contracts by Petrobras in the second quarter of 2021. The first contract covers up to 96 kilometers of flexible pipe for the Sapinhoá and Tupi fields and the second contract covers up to 226 kilometers of flexible pipe for the Marlim 2 and Itapu fields.

Including two flexible pipe contracts Petrobras awarded to Baker Hughes for the Buzios field in the first quarter of this year, Petrobras has contracted Baker Hughes during the first half of 2021 to provide it up to 370 kilometers of flexible pipe for its subsea projects. This is larger than the volume of flexible pipe awarded by Petrobras to Baker Hughes in 2019 and 2020 combined.

Baker Hughes flexible pipes will be used for a mix of production lines, gas injection flowlines, water injection lines, and services lines for pre- and post-salt subsea developments in Brazil. The company’s flexible pipe solutions are designed to ensure reliable connections and optimal flow under high pressures and in extreme temperatures and corrosive conditions.

“Our extensive deployment track record across the region, coupled with our in-depth experience in pipe design, manufacturing, and installation allows us to provide Petrobras with flexible pipe technology to increase the performance, reliability and economics of its most challenging subsea field developments,” said Domenico Di Giambattista, vice president of flexible pipe systems for Oilfield Equipment at Baker Hughes.

Today’s announcement follows Baker Hughes’ contract award from Petrobras for subsea oilfield equipment to support the revitalization of the Marlim and Voador fields in the Campos Basin offshore Brazil. The contract includes several key interconnected technologies from Baker Hughes’ Subsea Connect family of Aptara™ products, including subsea production and injection manifold systems. Petrobras also recently awarded the company a wellhead contract for Mero 4, the largest pre-salt field in Brazil.

“These back to back contract wins reflect our strong capabilities and the relationship we have developed with Petrobras as a trusted partner,” said Adyr Tourinho, vice president of Brazil and Oilfield Equipment for Latin America at Baker Hughes. “Whether it’s subsea wellheads, flowlines, or manifolds, our track record and expertise in the region translates into reliability, adaptability and efficiency for our customers.”

Sponsored Partners

Discover our premium partners and explore their innovative solutions in the industry
Cameroon
Yoyo-Yolanda Gas: Signals New Chapter for the Gulf of Guinea
Saturday February 7, 2026
Downstream
Nigeria to Engage Proven Competent Contractors to Revamp its Refineries
Thursday February 5, 2026
Conferences & Exhibitions
NCDMB Seeks Africa’s Paradigm Shift from Consumption to Creation of Innovation
Wednesday February 4, 2026

Sponsored Partners

Discover our premium partners and explore their innovative solutions in the industry

Nigeria
Nigeria Set to Utilise Gas to Power Africa’s Rise — Ojulari
Wednesday February 4, 2026
Conferences & Exhibitions
NIES 2026: African Energy Bank Officially Unveils its Maiden Headquarters In Nigeria
Tuesday February 3, 2026
Solar energy
Voltalia Secures a New 132-Megawatt Solar Project in Tunisia
Monday February 2, 2026
Mozambique
Mozambique LNG Onshore and Offshore Operation is Back on Track
Sunday February 1, 2026
Conferences & Exhibitions
SAIPEC Confirms First Series of Speakers for 10th Anniversary Programme
Thursday January 29, 2026
Technology
Halliburton, A*STAR Unveil NEX Lab, Advanced Well Completion Technologies
Wednesday January 28, 2026
Conferences & Exhibitions
African Heads of State Confirm Attendance at Nigeria International Energy Summit (NIES) 2026
Tuesday January 27, 2026