South Africa

AFRICA ENERGY ANNOUNCES TOTAL LUIPERD-1X TEST RESULTS OFFSHORE SOUTH AFRICA


Published: Tuesday December 15, 2020
By: Oilfield Africa Review

The Luiperd-1X well was opened to flow on November 1, 2020. After several tests at different choke settings, the well reached a maximum constrained flowrate through a 58/64″ choke of 33 million cubic feet per day of natural gas (“MMcfpd”) and 4,320 barrels of condensate per day (“bcpd”), an aggregate of approximately 9,820 barrels of oil equivalent per day (“boepd”). The choke configuration could not be increased due to surface equipment limitations. The absolute open flow (“AOF”) potential of the well is expected to be significantly higher than the restricted test rates.

 “The Luiperd discovery proves that the Outeniqua Basin offshore South Africa is a world-class hydrocarbon province that remains highly under-explored. Luiperd-1X intersected 85 meters gross sands of which 73 meters is net good quality pay in the main target interval and thicker than prognosed. The well reached total depth of approximately 3,400 meters on October 12, 2020, at which point the drill stem testing program was initiated. We are very pleased with the positive test results that show high condensate yield and excellent reservoir connectivity. These results confirm the joint venture’s decision to proceed with development studies and to engage authorities about commercialization,” Jan Maier, Africa Energy’s VP Exploration, said

Block 11B/12B is located in the Outeniqua Basin 175 kilometers off the southern coast of South Africa. The block covers an area of approximately 19,000 square kilometers with water depths ranging from 200 to 1,800 meters. The Paddavissie Fairway in the southwest corner of the block now includes both the Brulpadda and Luiperd discoveries, confirming the prolific petroleum system. The original five submarine fan prospects in the fairway all have direct hydrocarbon indicators recorded on both 2D and 3D seismic data and intersected in the wells, significantly de-risking future exploration.

Africa Energy holds 49% of the shares in Main Street 1549 Proprietary Limited, which has a 10% participating interest in Block 11B/12B. Total E&P South Africa B.V. is operator and has a 45% participating interest in Block 11B/12B.

Sponsored Partners

Discover our premium partners and explore their innovative solutions in the industry
Continental News
Nigerian Escravos–Lagos Pipeline Regains 100% Availability Level
Saturday January 3, 2026
New By Section
Baker Hughes, Cactus Seal Surface Pressure Control JV Deal
Saturday January 3, 2026
Nigeria
Major Nigerian Gas Pipeline Projects Near Completion
Wednesday December 31, 2025

Sponsored Partners

Discover our premium partners and explore their innovative solutions in the industry

Nigeria
Nigeria’s Oil Production Dips, as TAM on Facilities Progress
Wednesday December 31, 2025
Acquisition And Merger
M&P Acquires 61% Interest in Sinu-9 gas Permit for $185 million
Monday December 29, 2025
Acquisition And Merger
bp to sell a 65% Interest in Castrol to Stonepeak, valued $10 billion
Wednesday December 24, 2025